Streamlining Operations: $2.5MM CTB Consolidation Project in the Delaware Basin

Completed a $2.5MM project to consolidate two CTBs in Delaware, improving efficiency and reducing maintenance. Full scope docs, drawings, and 3D model, managed procurement, oversaw construction, and supported commissioning.

 

Project Spotlight: Streamlining Operations: $2.5MM CTB Consolidation Project in the Delaware Basin

We recently completed a $2.5MM multi-phase project to consolidate the East and West Central Tank Batteries (CTBs) at an existing facility. The goal was to improve production efficiency, streamline gas lift compression systems, reduce long-term maintenance, and reduce methane emissions from a poorly installed tank vent header system and gas pneumatic systems.

The project was executed in three phases. Phase 1 included the installation of new oil and water headers and expansion of the pipe rack system to reroute production flow. Phase 2 involved significant upgrades and reconfiguration work on both CTBs, including updated header piping, tank vent systems, blanket gas installations, and new VRU tie-ins. In Phase 3, we fully decommissioned and demolished the West CTB, safely removing all tanks, vessels, flare systems, and associated piping.

As part of our scope, we delivered a comprehensive, contractor-ready work package that included:

  • A detailed verbal Scope of Work covering every modification

  • All mechanical contractor bid forms and documentation

  • Full demo and new construction drawings

  • A 3D facility model

  • Piping specifications and construction guidelines

Our team managed all procurement activities, oversaw the construction process, and supported facility commissioning to ensure a seamless transition into consolidated operations.


Interested in quality engineering services for your upcoming oil and gas development? Contact us today to discuss how we can help ensure the success of your next project.