Timber Lake Compressor Station: TEG Dehydration Unit Design and Simulation
CUE EPCM simulated the TEG dehydration unit for Marathon’s Timber Lake Compressor Station, ensuring pipeline gas meets spec at 155 MMscfd. The design removes water to 6.5 lb/MM, includes BTEX controls, and supports future expansion with efficient, reliable performance.
Timber Lake Compressor Station: TEG Dehydration Unit Design and Simulation Read More »