Oil Battery

Meeting EPA Scrutiny: Vent Gas & Safeguarding Upgrades for South Midland Basin 9,000 BBL/d Oil Battery

CUE EPCM conducted a Vent Gas System and Safeguarding Study for our clients’ South Midland Basin CTB facility, recommending upgrades to improve system efficiency, overpressure protection, and fire safety. Key actions included regulator replacements and fire detection system installation.

Meeting EPA Scrutiny: Vent Gas & Safeguarding Upgrades for South Midland Basin 9,000 BBL/d Oil Battery Read More »

Optimizing Performance & Reducing Costs: Delaware Oil Battery Emissions Upgrades

Ongoing support at a Delaware gas facility led to over 50 upgrades, VRU optimization, flare system improvements, and cost-saving solutions. We provided ROI analysis and a full bid-ready SOW package to guide future investments and enhance operational reliability.

Optimizing Performance & Reducing Costs: Delaware Oil Battery Emissions Upgrades Read More »

Operational Issues: Uncontrolled Venting/Flaring, Multiple VRU’s Seized, EPA Shutdown Threats

$32M oil facility near the NM border was losing 800 BBL/day, flaring black smoke, and facing shutdown threats from regulators and the midstream. Oxygen infiltration and seized VRUs added to the crisis. We were brought in to help stabilize and solve it.

Operational Issues: Uncontrolled Venting/Flaring, Multiple VRU’s Seized, EPA Shutdown Threats Read More »

Scroll to Top